FAQs
More FAQs- Will the application of urethane disrupt my business?
- How long will it take to have my floors coated with acrylic?
- How do you maintain worksite quality?
The initial application process will require stripping any existing coatings and applying urethane coating plus drying time. This process can be done after hours and will require only daily cleaning for the life of the finish, averaging two years. Because there is no buffing or recoating for that time period, there will be no other disruptions. The reapplication process will not require further stripping.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
The ServiceMaster Clean Quality Assurance Program is designed to establish a continuous method of evaluating and monitoring janitorial services. The program is tailored to suit various types of complex office buildings, plants, schools, malls and healthcare facilities. ServiceMaster of Kingston, Belleville and Trenton can assure you that your premises will benefit from the highest level of quality control available at all times by combining highly trained staff with state-of-the-art software driven technologies that allow stakeholders to communicate concerns in real time.