FAQs
More FAQs- Why is post construction cleaning important?
- Is urethane slippery when wet?
- How long will it take to have my floors coated with acrylic?
Post construction dust and dirt can be harmful to the health of the building’s occupants and it is quite often difficult to remove. Post construction cleaning requires specialized equipment, products and expertise to effectively remove the airborne dust particles and residue that settles everywhere after construction and renovation, including on furnishings, carpet, wall hangings, windows and fittings, sanitary fittings, walls, hard surfaces and tile floors.
Any coated surface can be slippery when wet. Our urethane product is considered to have acceptable slip resistance according to the American National Standards Institute (ANSI)/National Floor Safety Institute (NFSI) B101.3-2012 test method for measuring wet dynamic coefficient of friction (DCOF) of common hard-surface floor materials. We offer optional additives to create high slip resistance (lower probability of slipping) for wet environments or areas of concern.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.